Help Sitemap Home Skip Navigation Contact Us Disability Statement

Grovewood Logo
FOR ALL YOUR DOUBLE GLAZING NEEDS
0845 470 1977
Keeping you warm in the Winter and cool in the Summer
www.grovewoodonline.co.uk
 
 
Thursday, 8th January 2009

Premium Article !

Your account has been frozen. For your available options click the below button.

Options

Premium Article !

To read this article in full you must have registered and have a Premium Content Subscription with the n/a site.

Subscribe

Registered Article !

To read this article in full you must be registered with the site.

New loos save water



Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image

Published Date: 09 October 2008
MAINS water usage at the South of England Centre in Ardingly has been cut thanks to the installation of a block of 'eco-toilets'.
Water usage from the mains has been cut by up to 25 per cent per flush with the toilets using rainwater to bolster volume.

The biggest initial test for the new eco-toilets at the centre was the South of England Show, which took place in June.

Over the course of the three-day show, there were more than 80,000 visitors, as well as several thousand exhibitors.

Previously all water was drawn from the mains supply to service the old toilets, now with the new eco-toilets in place, this consumption has already been significantly reduced with the help of the recent summer rainfall.

The eco-toilets were designed by Bolney based Ecotecture. They are constructed incorporating a variety of energy saving features including two large recycled plastic containers outside which are used to collect rainwater from the roof.





The full article contains 168 words and appears in n/a newspaper.
Page 1 of 1

  • Last Updated: 09 October 2008 2:24 PM
  • Source: n/a
  • Location: Haywards Heath
 
 
  

 
 


Sister Newspapers:
Press Complaints Commission

This website and its associated newspaper adheres to the Press Complaints Commission’s Code of Practice. If you have a complaint about editorial content which relates to inaccuracy or intrusion, then contact the Editor by clicking here.

If you remain dissatisfied with the response provided then you can contact the PCC by clicking here.